SystemWorkforce, HR & Knowledge

Strategic Workforce Planning

Strategic workforce planning for utilities that sees the skills cliff five years out, and the capital projects behind it

See the skills cliff five years out, and close it for $7.0M less than contractors.

See one case, screen by screen ↓
target$412Mof 2029 grid projects staffed with the protection engineers they need — Harrow Ridge 400 kV, Eastmere Solar, relay modernisation and three more
estimated$7.0Mless than covering the protection gap with contractors, 2027–2031: a $4.48M plan against $11.5M (90 FTE-years × $128K premium)
demo40%of the 2029 protection and control work with nobody to do it if nothing changes — 42 engineers for 70 FTE of work
target12placesin the protection graduate pipeline, sized to the real work in 2029 and started in 2027 — two cohorts of six
In short

What is Strategic Workforce Planning?

Strategic workforce planning forecasts whether a utility will have the people, by role, region and year, to run its networks and deliver its capital plan, and sizes how to close the gap. Strategic Workforce Planning does it with six agents that read HR, the pension rules, the training records and the capital plan every night, and show the skills cliff across 14 critical roles to 2031.

How to choose AI solutions for utilities →

Updated

The problem

Why utilities find the skills gap when a project cannot be commissioned

The board asks one question: will we have the people to run the network and build the capital plan? Today the answer comes from an annual headcount plan in spreadsheets, HRIS reports of age and service, and a retirement rule of thumb at 65. The capital plan lives in project systems, with resourcing by trade, rarely by named skill. Training intakes are set by budget and last year's numbers. HR tools model headcount and cost well, but seldom read the capital plan, so the demand side is a guess.

So the gap shows up late: a project cannot find protection engineers for commissioning, and the fix is contractors at a premium or a slipped energisation date. An intake cut in a tight year arrives as a shortage three years later, because a protection graduate takes 24 months to work unsupervised and a lineworker apprentice 42. Skills held by one or two people, like IEC 61850 station commissioning or GIS busbar protection, retire without a successor.

typical56%of utility workers have under 10 years of service (CEWD 2023 survey)
typical1 in 3of TVA's workforce can retire within five years (TVA Office of Inspector General, 2024)
typical21%of water utility staff can retire within five years (AWWA, 2025)
Where a workforce plan's working days goestimated
By hand50 days
With the solution8.5 days
  • Pulling HR extracts and mapping job codes to critical roles8 → 0.5 d
  • Applying the pension rules and forecasting retirements and leavers6 → 0.5 d
  • Collecting resourcing from every capital project12 → 1 d
  • Building the gap by role, region and year6 → 0.5 d
  • Sizing and costing hire, train, keep and contract options8 → 2 d
  • Confirming demand with role owners, Finance approval and sign-off10 → 4 d

Estimated split, in working days, for one five-year plan across the critical roles — by spreadsheet, and with the solution. The forecast itself refreshes every night.

How it works

How people data and the capital plan become a workforce plan

Six specialist agents read HR and the capital plan, draw the skills cliff and size the plan; the Chief People Officer signs.

What comes in
Data in6 sources · HR, pension rules, capital plan, volumes, training, contractors
Agents at work
Workforce data readerroles + eligibility
Then
Retirement and leaver forecaster
Capital demand translatorprojects → FTE
Then
Gap analystthe skills cliff
Critical-role risk assessor
Then
Pipeline and scenario plannerhire · train · keep · contract
A person decides
Chief People Officersigns; role owner and Finance approve first
What comes out
Gap by role, region, year
Critical-role risk register
Signed workforce plan
One case, step by step

One role, from the skills cliff to a signed workforce plan

Lumina Utilities runs electricity and water networks across four regions. Its electricity capital plan peaks in 2029, the same year many of its protection and control engineers can retire. Here is how the 2029 protection gap is found, explained and closed, screen by screen, in the working solution.

  1. 01Morning

    The skills cliff, not a headcount table

    Nadia Okafor · Head of Strategic Workforce Planning

    Nadia builds the five-year workforce plan and answers the board's question: do we have the people? Her home screen is a heatmap of 14 critical roles across electricity network, generation and water, year by year from 2026 to 2031, each cell the share of the work with nobody to do it. Above it sits capital plan v2026.3, $1.26B of work. In 2029, with no action, Lumina is 288 FTE short across the 14 roles, and 4 roles are 25% or more short.

    “I can count who retires. I can't see what work is coming.” — Nadia Okafor

  2. 0202:10–02:24

    Five agents rebuilt the forecast while Lumina slept

    The overnight refresh

    The workforce data reader read 6,840 HR records from the 23:00 extract: 1,546 people in critical roles, 37 job codes held for review. The forecaster found 390 people who can retire by 2031 and expects 294 to. The capital demand translator read 214 projects, 14 of them needing critical skills, and noticed the Eastmere connection moved from Q4 to Q2 2029. The planner drafted a protection plan for Nadia to review.

    Needs a person: “37 people have a job code with no critical role” — the data reader suggests a role and asks, it never guesses.

  3. 03Why the cliff exists

    The same grid, coloured by retirements

    Retirement and leaver forecaster

    A switch recolours the grid by Gap, Retirements, Leavers or New work, so the reason for each cliff is visible. By retirements, protection and control engineers reach 13% of today's people in 2029 and 21% in 2031; high-voltage cable jointers reach 28% in 2031. The forecaster uses Lumina's pension rule — age 60, or 55 with 30 years' service — and Lumina's own history, not an assumption that everyone goes at 65.

    Limit: “Never assumes everyone retires at eligibility · never forecasts below a group of 5.”

  4. 04One click on a cell

    40% short in 2029 — and where the number comes from

    Gap analyst

    Nadia clicks protection and control engineers, 2029. The rail explains it: 48 people today, 4 trainees finish, 6 retire, 4 leave, so 42 in post against 70 FTE of work — 28 FTE short. The work is 44 FTE of everyday testing, faults and maintenance plus 26 from six projects. Every line opens its source; the retirement line opens the history behind it.

    Retirement history 2019–2025: “Of 213 engineers who became eligible, 38% retired in their first eligible year, 24% in the second, and 3 in 7 offered phased retirement accepted.”

  5. 05One click on a project

    Harrow Ridge lights up the roles it needs

    Capital demand translator

    On the capital plan ribbon, Nadia clicks Harrow Ridge 400 kV substation: $186M, energise Q3 2029, Highland. The cells it draws on light up with the FTE it needs each year — 9 protection and control engineers in 2029, 10 substation and relay technicians, 6 transmission lineworkers and 3 SCADA and telecoms engineers. A what-if slips the project a year to show the cliff move, without changing the capital plan.

    “The capital demand translator turned this project's resourcing line into FTE for 4 critical roles.”

  6. 06The source

    Every FTE read from the project's own resourcing line

    Ken Whitlow · Director of Network Delivery

    Capital demand shows each project's FTE by year for the chosen role, beside the document it came from. For Harrow Ridge: project brief HR-400 rev C, page 12, WBS 4.3 protection and control, owner Ken Whitlow — 14 bays of 400 kV GIS, two supergrid transformers and the station bus to IEC 61850, all commissioned between April and September 2029. 14,400 hours in 2029 at 1,600 productive hours a year is 9 FTE.

    “Harrow Ridge energises in Q3 2029 with or without the engineers. Without them it doesn't.” — Ken Whitlow

  7. 07The role in depth

    Which skills leave with the people

    Owen Castell · Protection and Control Manager

    Owen runs Lumina's 48 protection engineers. The role page shows people against the work to 2031, when people can retire in groups of five or more with no names, and the skills that matter: IEC 61850 station commissioning is held by 5 people and 3 can retire by 2029; GIS busbar protection by 2, with 1 left. Four skills are left with two people or fewer by 2029, and Owen can ask for a successor plan for each.

    “13 of 48 can retire by 2029, and the forecaster expects 6 to.”

  8. 08Size the pipeline

    Hire 8, keep 3, contract 6 — and train 12

    Pipeline and scenario planner

    The planner works from the 2029 gap of 28 FTE. The market gives about 8 experienced hires over 2027–28 (38 applicants for 5 roles in 2025). History says 3 of the 7 seniors eligible in 2027–28 will accept phased retirement. The two framework suppliers can cover 6 FTE at the peak. That leaves 11 who must be competent by 2029; at 24 months and 92% finishing, the intake is 12, two cohorts of six in January and September 2027.

    Check the constraint: “12 graduates need 6 mentors at 1:2 · 9 seniors can mentor in 2027 after retirements.”

  9. 09Signed

    Demand confirmed, cost approved, plan signed

    Priya Raman · Finance Business Partner · Rafael Duarte · Chief People Officer

    The mix costs $4.48M above payroll over 2027–2031 — train $1.15M, hire $1.01M, keep $0.27M, contract $2.05M — against $11.5M to cover the gap with contractors, if the market has them. Hiring only leaves 2029 29% short. Nadia sends it: Owen Castell confirms the 70 FTE of demand, Priya Raman approves $4.48M, and Rafael Duarte signs protection plan v1.

    “Nothing is committed until the Chief People Officer signs. Agents never open a requisition or make an offer.”

  10. 10Jan and Sep 2027

    Two graduate cohorts open, sized to the real work

    Nadia Okafor · Head of Strategic Workforce Planning

    On the training pipeline, the two protection graduate cohorts of 2027 move from proposed to approved, competent in January and September 2029. Capacity to train is shown beside them: 15 protection seniors able to mentor, 9 after the 2027–28 retirements, 6 needed. Back on the skills cliff, protection in 2029 now reads Covered.

    “Mentoring is tight: 6 of the 9 available seniors would mentor in 2027–28, and 3 of them are the seniors asked to stay longer.”

Who it’s for

Built for everyone who owns a workforce plan.

The same protection gap, seen by the five people who plan, deliver, pay for and sign it — what their year looked like, and what it looks like now.

NO
Nadia OkaforHead of Strategic Workforce Planning, People · builds and sends the plan
Head of Strategic Workforce Planning
Before
Builds the five-year plan from HR reports of age and service and a retirement rule of thumb. “I can count who retires. I can't see what work is coming.”
Now
Opens a skills cliff refreshed overnight, clicks any cell to see who retires, who leaves and which projects need the people, and sends a sized, costed plan.
RD
Rafael DuarteChief People Officer · signs the workforce plan, owns the training budget
Chief People Officer
Before
Signs a headcount plan that cannot say which roles will stop a project. “Show me the three roles that will stop a project.”
Now
Sees the cliff with no action and with the proposed plans side by side, and signs only after the role owner and Finance have approved.
KW
Ken WhitlowDirector of Network Delivery · delivers the electricity capital plan
Director of Network Delivery
Before
Resources projects by trade and finds the protection gap at commissioning. “Harrow Ridge energises in Q3 2029 with or without the engineers. Without them it doesn't.”
Now
Sees every project's demand by role and year, read from its own resourcing line and page, and gets asked when a project has no work breakdown.
PR
Priya RamanFinance Business Partner, People and Capital · approves the cost
Finance Business Partner
Before
Compares options built in separate spreadsheets. “Train, hire or contract: give me the five-year cost of each.”
Now
Reads the five-year cost of every lever against all-contract and hire-only, and approves $4.48M with every input cited.
OC
Owen CastellProtection and Control Manager · runs 48 engineers, owns the relay programme
Protection and Control Manager
Before
Knows the single-person skills in his head. “Five people can commission an IEC 61850 station. Three of them retire by 2029.”
Now
Sees each critical skill with how many hold it, how many can retire and who can cover, asks for successor plans and confirms the demand.
Built on the engine

6 agents. Each with one job, and hard limits.

Six specialist agents read HR and the capital plan, draw the skills cliff and size the plan; the Chief People Officer signs.

Workforce data reader

Reads the HR extract, the pension eligibility rules and the training records each night, maps every job code to one of the 14 critical roles, and finds missing or odd records.

  • Never shows an individual's retirement date outside HR
  • Never guesses a role for an unmapped job code — it holds it for the planner with a suggested role and the reason
  • Never copies names or dates out of HR
Retirement and leaver forecaster

Turns pension eligibility into expected retirements by year from Lumina's own 2019–2025 history, and forecasts leavers by role and region.

  • Never assumes everyone retires at eligibility
  • Never uses age alone
  • Never forecasts a group smaller than 5
Capital demand translator

Reads the capital plan, project briefs and work volumes, and turns each resourcing line into FTE by role, region and year at 1,600 productive hours a year, with the document and page it came from.

  • Never changes the capital plan or a project date
  • Every FTE cites its document and page
  • Where a project has no resourcing, marks its demand estimated and asks the project owner
Gap analyst

Builds the skills cliff — supply against demand for every role, region and year — explains every cell, and flags roles 25% or more short.

  • Never hides a gap because a plan is only drafted
Pipeline and scenario planner

Sizes the hire, train, keep and contract mix for a role from the largest gap year, sizes the training intake from time to competence and completion rate, checks mentor and training-centre capacity, and costs each option against contractors.

  • Never commits budget, opens a requisition or makes an offer
  • Every number in a plan is cited
  • Recommends — the role owner, Finance and the Chief People Officer decide
Critical-role risk assessor

Keeps the critical-role risk register, scoring each role on who can retire, time to competence, skills held by one or two people, successor cover and the market.

  • Never names a person in the register — skill cover is shown as counts
Chief People Officer

Signs; role owner confirms demand; Finance approves cost. The agents propose; a named person decides.

Ask in plain words

Ask about any role, year or project

Ask in plain words, or say what to change in a plan. Every answer points to the HR extract, the pension rule or the project page it used.

Why do protection engineers hit 40% short in 2029?

Because three things land in the same year. Six of today's 48 engineers are expected to retire and four to leave, while four trainees finish, so 42 are in post. The work rises to 70 FTE: 44 everyday plus 26 from six projects, led by Harrow Ridge 400 kV (9), relay modernisation (6) and Eastmere Solar (4). 28 FTE short is 40%.

Size the training pipeline for protection engineers

The 2029 gap is 28 FTE. The market gives about 8 experienced hires, 3 seniors are likely to take phased retirement and contractors are capped at 6. That leaves 11 who must be competent by 2029; at 24 months and 92% finishing, the intake is 12, in two cohorts of six in 2027.

What if Harrow Ridge slips to 2030?

Then 2029 eases and 2030 gets worse. Protection demand in 2029 drops from 70 to 65 FTE, a 35% gap, and 2030 rises to 68 FTE, a 43% gap, the worst year. The training intake still has to start in 2027. Nothing is changed in the capital plan.

Which roles lose a skill held by one or two people?

By 2029, 11 skills are left with two people or fewer, across 7 roles. The sharpest: oil-filled cable repair (nobody left) in cable jointers; GIS busbar protection (1 left) in protection and control engineers; GIS gas handling (1 left) in substation and relay technicians; legacy RTU protocols (1 left) in SCADA and telecoms engineers. Cable jointers have no plan yet.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The skills cliff14 critical roles year by year to 2031 under the capital plan ribbon, with the selected cell explained in the rail.
Workforce dataThe six sources with their freshness, the overnight refresh step by step, and the issues that need a person.
Coloured by retirementsThe same grid recoloured by expected retirements as a share of today's people, to show why each cliff exists.
Where a number comes fromEvery line of a cell opens its source — here the retirement history behind the forecast.
One project's demandClick a project and the roles it draws on light up, with the FTE it needs each year.
Capital plan to skillsFTE by project and year for a role, beside the project brief and resourcing line it was read from.
A role in depthPeople against the work to 2031, when people can retire in groups of five or more, and the skills held by one or two people.
Hire, train, keep or contractThe levers, the gap closing year by year, the planner's working and the five-year cost against contractors.
Approve and signThe role owner confirms demand, Finance approves the cost and the Chief People Officer signs the plan.
The cliff with the plansThe skills cliff with proposed and drafted plans: protection covered, cable jointers still short.
The training pipelineEvery cohort from intake to competence against the year its role runs short, with mentors and places to train.
Critical-role risk registerEach role scored on who can retire, time to competence, single-person skills, successor cover and the market. No person is named.
Your assumptionsHorizon, pension rule, retirement history, time to competence, costs, colours, privacy and approvals.
Governance

Built for people data: counted, cited, signed.

Every number opens its workingEach cell on the skills cliff breaks down into people today, trainees, retirements, leavers and the work behind it, and each line opens its source: the HR extract and its date, the pension rule, the retirement history, the project document and page.
Names and dates stay in HRPlanners see roles and counts. No individual's name or retirement date leaves HR, groups smaller than five are merged, and the risk register names no one. Only the HR business partner sees named records for their teams.
Three approvals before anything is committedThe role owner confirms the demand, Finance approves the cost and the Chief People Officer signs. Signed plans are versioned, and a proposed training cohort opens only when its plan is signed.
Agents recommend, people commitNo agent commits budget, opens a requisition, makes an offer, changes the capital plan or a project date, or changes a person's record. Slipping a project is only a what-if; nothing changes in the capital plan.
No gap hidden by a draftA gap stays on the grid until a plan is signed, and roles with no plan yet are shown as such. Unmapped job codes and projects with only indicative resourcing are held for a person to fix, not guessed.
Every change on the recordEvery plan sized, sent, confirmed, approved and signed is recorded with who and when, and so is every data fix. A settings change previews first, applies from the next refresh and is saved as a new version.
Configuration

Your pension rules and assumptions, not ours

The horizon, the eligibility rule, time to competence, the contractor premium and the approvals are settings. A change previews first and applies from the next refresh.

SettingDefaultChoose from
Horizon2026–20312026–2031 · 2026–2033 · 2026–2036 — rolls forward every January
Eligibility ruleAge 60, or 55 with 30 yearsAge 60, or 55 with 30 years · Age 61, or 55 with 30 years — Lumina Pension Plan
Retirement probabilityFrom 2019–2025 historyFrom 2019–2025 history · From 2022–2025 history · Everyone at eligibility
RefreshEvery night at 02:10Every night at 02:10 · Every Monday 02:10 — and after a new capital plan
Productive hours per FTE1,600Turns project hours into FTE; adjusted in steps of 50
Time to competenceProtection graduate 24 monthsSet per role — lineworker apprentice 42 · transmission apprentice 48 · cable jointer trainee 36 · water operator Grade 3 18 months
Contractor premium, protection$128K a yearA year above an employee cost of $165K; the graduate programme is set beside it at $96K per graduate
ApprovalsAll onRole owner confirms demand · Finance approves cost over $250K · Chief People Officer signs
Connections

Works with the people data and plans a utility already keeps

HR systemthe nightly extract: employees, job codes, grades, tenure and demographics
Pension eligibility ruleseach scheme's normal and early eligibility, and rule changes for new joiners
Capital plan and project briefsthe approved plan, milestones and each project's resourcing lines by trade
Work volumesmaintenance, faults, connections and meter installs, the everyday work
Training recordscohorts, trainees, completion rates and competence dates
Contractor framework and ratesframework suppliers, their FTE cap and the premium above employee cost
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
$412M
of 2029 grid projects staffed with the protection engineers they need
70 of 70 FTE in 2029
protection engineers, with the plan
estimated
$7.0M
less than covering the protection gap with contractors, 2027–2031
Contractors$11.5M
Hire, train, keep, contract$4.5M
target
12places
in the training pipeline, sized to the real work in 2029 and started in 2027
11 of 12 competent by 2029
24 months, 92% finish

“demo” = seen in the working solution, on its sample data · “target” = the design goal, measured in the live solution · “estimated” = our arithmetic, inputs shown: $7.0M = 90 FTE-years × $128K contractor premium ($11.5M) less the plan's $4.48M (train $1.15M · hire $1.01M · keep $0.27M · contract $2.05M), demo data; the working-days split is also our estimate · “typical” = published figures: CEWD 2023 workforce survey (56% of utility workers under 10 years of service); TVA Office of Inspector General, 2024 (a third of the workforce can retire within five years); AWWA 2025 (21% of water utility staff can retire within five years). Lumina Utilities, its regions, projects, records and the people named on this page are fictional — characters and sample data in the working solution.

Questions

What utility HR and operations leaders ask us.

What is strategic workforce planning for utilities?

Strategic workforce planning forecasts whether a utility will have the people, by role, region and year, to run its networks and deliver its capital plan, and sizes how to close the gap. Strategic Workforce Planning does it with six agents that read HR, the pension rules, the training records and the capital plan every night, and show the skills cliff across 14 critical roles to 2031.

How does workforce planning software forecast utility retirements?

The forecaster applies your pension eligibility rule to each role and then your own retirement history by year of eligibility — at Lumina, 38% of engineers retire in their first eligible year — instead of assuming everyone retires at 65. It adds leavers by role from your history, and never forecasts a group smaller than five.

How does it turn the capital plan into workforce demand?

The capital demand translator reads each project's resourcing lines and converts hours by trade into FTE by role, region and year at your productive hours per FTE, citing the document and page. Click a project to see the roles it needs; slip it a year in a what-if to see the cliff move. It never changes the capital plan.

Can it size the training pipeline for lineworkers and engineers?

Yes. The planner starts from the largest gap year, takes what the market, phased retirement and your contractor framework can supply, and sizes the intake from time to competence and the completion rate. For Lumina's protection engineers that is 12 graduates in two cohorts of six in 2027, with the mentor constraint checked.

How does it find critical roles and skills held by one or two people?

The critical-role risk register scores each role from 0 to 100 on retirement eligibility, time to competence, skills held by one or two people, successor cover and the market. Each role page lists its critical skills with how many people hold them and how many can retire, so a successor plan can be asked for before the skill leaves.

Does it show individual employees' retirement dates?

No. Planners see roles and counts; names and retirement dates stay in HR, groups smaller than five are merged, and the risk register names no one. Only an HR business partner sees named records for their own teams.

Do people stay in control of the workforce plan?

Yes. The agents forecast, explain and recommend; they never commit budget, open a requisition, make an offer or change a person's record. The role owner confirms the demand, Finance approves the cost and the Chief People Officer signs before anything is committed.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your HR extract, pension rules, capital plan, training records and contractor framework — and it goes live once every quality gate has passed. We will walk you through it on your own critical roles first.

See it on
your workforce.

We'll run Strategic Workforce Planning on your own HR extract, pension rules and capital plan.